This proved a challenge for Mark our wonderful tiler – but something he rose to, the results of his hard work speak for themselves! The bath in this room is the Tissino Lorenzo premium and will provide enough space for a really luxury bathing experience.
The storage in the room comes in the form of a Deuco floor standing unit under the basin and also a mirrored, illuminated cabinet above.
Our engineer Shay took the lead on the installation of this bathroom which took around 3 weeks from start to finish, with Mark onsite tiling for 4 days for the 16 square metres.
Work was extensive even though the room is small- we blocked up the window to create more space and all walls were made good and plastered. The preparation of the space is key for a high quality end result which we believe we have achieved here.